Technical visit to Tseung Kwan O Sea Piling Works
 


Date, time & venue

2019-06-15;9:00 am- 12:00 pm;To be confirmed later

Technical visit to Tseung Kwan O Sea Piling Works

Organizer: HKIE Materials Division,


Co-organizer:  Hong Kong Institute of Vocational Education (Tuen Mun), Department of Construction

 

Date, Time & Venue:

15 June 2019 (Saturday) 9:00 am- 12:00 pm

Assembly:   To be confirmed later,.

 

Programme Highlights

This project includes construction of marine viaduct for the connection of the Tseung Kwan O -Lam Tin Tunnel and Cross Bay Link. This will link up TKO with the new business center in Kowloon East and provide an alternative route for the residents. It includes more than 50nos of large diameter bored pile and subsequent superstructure construction work on marine. The visit is to understand the method and machinery to be used in sea piling construction, challenge that faced and how to protect environment in marine piling work.

Representative(s) from the Shanghai Tunnel (HK) Ltd Co. Ltd will take the participants to see the construction view and present the process of construction in the public area.

 

Registration & Enquiries

The number of participants is limited to 25. Tuen Mun IVE Students are the first priority

 

For enquiries, please contact Ir CS Lam at lamchising@hotmail.com and 91527659


Note:

1.     No safety helmet is required, after the talk in the site office, the participants will go out to a public place for viewing sea piling construction activity.

2.     Insurance from IVE TM






Report

Technical Visit to Sea Piling works of Tseung Kwan O – Lam Tin Tunnel Tsueng Kwan O Interchange and Associated Works

By Mr. John CHAN

 

On 15 June 2019 sunny morning, a group of civil engineering students from Hong Kong Institute of Vocational Education (IVE) (Tuen Mun) visited the site of sea piling works for the Tseung Kwan O – Lam Tin Tunnel Tsueng Kwan O Interchange and Associated Works. Materials Division of HKIE had arranged this technical visit for them, and this visit was conducted by Mr. CHENG Tak Sum, Senior Construction Manager, and Ir MAN Ngo Yin Leo, Assistant Project Manager of Shanghai Tunnel (HK) Co., Ltd., one of the main contactors of this construction contract.

 

The technical visit was divided into two parts, the first part was project introduction and briefing of construction technologies and plants for sea piling works by Mr. T. S.CHENG. He shared his over 40 years experiences in civil engineering construction to the students, enriching their horizon from construction site safety to construction details, he went through every steps of the procedure of construction of sea piling works, including setting-out of location of piles, construction of temporary steel platforms for driving of steel casing and concreting technique for sea piles. Mr. CHENG’s fruitful sharing gave great benefits to the students.

 

The second part was site inspection from the observatory platform, Ir Leo MAN  guided the students to understand the details of sea piling works including the site arrangement of marine works, use of barges & tug boat and construction sequences of piling works at sea etc. This visit was an opportunity to let the students deeply understand the details and challenges in marine engineering works and widen their horizon in civil engineering construction.

 

Finally, we would give a sincere thanks to Ir LAM Chi Sing of the Materials Division, HKIE for his co-ordination and arrangement of this fruitful technical visit for IVE students.